Transmission Line Workers

Project Description

Dominion Energy South Carolina contractors will replace existing wooden poles along this 12-mile corridor with self-supporting galvanized steel structures. Both transmission lines are contained in the same right of way and will be consolidated to one single pole line during the rebuild. The new line will meet all modern electric codes as well as provide additional reliability and resiliency to the surrounding communities.

Location

The project will connect Edgefield and McCormick counties, beginning in Georgia at Dominion Energy’s Stevens Creek Generation Plant. From there, the line crosses the Savannah River to South Carolina and stretches through the Sumter National Forest into the Meriwether community. At Meriwether, the line crosses S.C. Highway 28 and terminates at the existing Clark Hill Switching Station on Clarks Hill Highway.

Timeframe

The engineering design and environmental permitting began in the first quarter of 2022 and will continue throughout the year. Construction is scheduled to start in the first quarter of 2023 and is expected to be complete by the end of 2024.

To ensure a safe and efficient work zone, traffic control may be required at road crossings.

Questions

Contact Dominion Energy SC at 1-866-865-1466 or SCPowerLine@dominionenergy.com with questions. Letters will be sent out to neighboring property owners along the route.

Benefits

  • Maintains current right of way
  • New structures located in the same general location as existing structures
  • Complies with mandatory standards to ensure safety, reliability and to meet future needs
  • Minimizes impact to the community and environment
  • Replaces aging infrastructure

Contact Us

Call us M - F, 8am - 5pm

(866) 865 - 1466

Construction-Related Impacts

Service Interruption

Your electric service is not expected to be impacted by this project.

Equipment Lifespan

60 Years

The equipment has been in service for more than 60 years and needs to be replaced.

Traffic

This project is not expected to impact traffic.

Noise

Noise levels are expected to be low.

Construction Times

8am- 5pm

Most work will be completed between these hours, on weekdays.

Environmental Impact

This project will have minimal environmental impact.

Neighborhood Impact

Access to surrounding neighborhoods will not be impacted.