Overview
The Morrisville–Wishing Star 500 & 230 Kilovolt (kV) Project is a vital infrastructure upgrade spanning Fauquier, Prince William, and Loudoun counties. The project includes:
- Installing a new 500 kV transmission line along or near 36.5 miles of existing right of way (ROW)
- Adding a new 230 kV transmission line in Fauquier County
- Expanding the Morrisville Substation
These improvements will strengthen our electric grid, improve efficiency, and ensure continued reliability.
Dominion Energy has proposed a primary route and evaluated several alternatives along the full route. We invite your input.
Updates
- February 2026: Dominion Energy filed its application with the SCC. Please view the Legal tab for the complete application.
- December 2025: During ongoing engineering design, our engineering team identified construction and outage challenges within the Pageland 1 alternative route that were caused by the multiple east-to-west crossings of existing corridor. Therefore, the Pageland 1 alternative route was updated to eliminate these challenges by replacing two eastern expansion areas in the previous route with an 85-foot-wide western expansion of the existing corridor south of Sudley Road in Prince William County.
- October 2025 Update: After further analysis, our engineering team has eliminated the alternative routes in Segment 2B (Fauquier) and a portion of Segment 3 (Prince William). These alternatives will be described in Dominion’s CPCN application as “considered but eliminated” and will not be offered to the SCC as a viable routing option.
- August 2025 Update: After continued evaluation, public feedback, and input, the alternative routes previously identified in Segment 1 in Fauquier County have been eliminated for consideration.
- July 2025 Update: At this time, Dominion Energy has not yet submitted an application to the Virginia SCC. We are continuing our routing analysis for the Morrisville–Wishing Star project and taking into account feedback we’ve heard from our community meetings. We expect to file an SCC application by late 2025 or early 2026.
- June 2025 Update: After continued evaluation, public feedback, and input, the three alternative routes previously identified in Loudoun County have been eliminated for consideration. View the updated announcement.
Timeline
- March–November 2025 – Public outreach and engagement
- Early 2026 – Submit application to the State Corporation Commission (SCC)
- 9–12 months after filing – Anticipated SCC approval
- Spring 2027 – Begin project construction
- Summer 2030 – Construction completed
Benefits
- Complies with mandatory standards to ensure safety, reliability and to meet future needs
- Minimizes impact to the community and environment
- Strengthens area reliability
FAQ
Construction Methods & Right-of-Way
Both boring and trenching require a similar right-of-way width due to equipment access, safety buffers, and space needed for staging and spoil management.
While wreck and rebuild can be used in specific segments, constraints such as reliability requirements and existing infrastructure prevent its use along the entire corridor.
Dominion Energy is evaluating construction methods segment by segment and will consider wrecking and rebuilding where technically feasible.
Environmental & Visual Mitigation
Yes, undergrounding was considered; however, it presents significant technical, environmental, and cost challenges, particularly in historically sensitive areas like the Manassas National Battlefield Park.
Need & Justification
The demand for reliable electricity has grown significantly since 2008, driven by regional load growth, including data center development. The new line addresses current and projected capacity and reliability needs.
Alternatives Analysis
Alternate “greenfield” routes are being considered in areas where wrecking and rebuilding or expanding the right-of-way would not be feasible due to existing development.
Yes, developing new greenfield routes often requires more land acquisition, permitting, and environmental review, making them generally more expensive and complex than expanding within an existing corridor.
Regulatory, Legal & Access Issues
Yes, conservation easements often include restrictions that limit development. Dominion Energy must evaluate these on a case-by-case basis and may require legal agreements or approvals to proceed.
Maps
Three maps included with the Project SCC Application are shown below, including a one-page overview map and two zoomed-in map series showing constraints and the areas of existing and new Project right-of-way.
Legal
The Virginia State Corporation Commission (SCC) is responsible for verifying the need, approving the route and structures and reviewing the environmental impact of certain transmission lines in Virginia. On February 27, 2026, Dominion Energy filed its application with the SCC.
- Our SCC application review process
- Application Volume 1
- Application Volume 2
- Application Volume 3
- Application Volume 4
- Application Volume 5
- Application Volume 6
- Application Volume 7
Documents related to the case are available to the public on the SCC Docket of the SCC website or search by Case No. PUR-2026-00021 in the "Search Cases" section. In addition, interested parties may visit the SCC Case Comments Page where individual mailboxes are available for each case accepting public comments.
Past Meetings
Wednesday, November 19, 2025
In-person Open House (Prince William County)
George Mason University's SciTech Campus
Beacon Hall
June 2, 2025
Virtual Open House
View the Presentation - June 2, 2025
May 21, 2025
In-person Open House (Loudoun County)
The Lodge at Hanson Park
Aldie, VA
May 15, 2025
In-person Open House (Prince William County)
Patriot High School
Nokesville, VA
May 13, 2025
In-person Open House (Fauquier County)
Mary Walter Elementary
Bealeton, VA
May 5, 2025
Virtual Open House
View the Presentation - May 5, 2025
View Recording - May 5, 2025
April 30, 2024
Virtual Meeting
View the Presentation - April 2024
View Recording:
Community Engagement
Public Engagement Process
Public participation and involvement are vital to project planning and execution. At Dominion Energy we strive to improve the physical, social, and economic well-being of the communities we serve.
Once a project need is identified, conceptual project planning and design begins. Dominion Energy consults with key stakeholders throughout the planning process to gather and incorporate feedback into design plans. Key stakeholders include local, county, and state officials, state and federal agencies, historic preservation and natural resource groups, Native American tribes, and community members.
Dominion Energy encourages all stakeholders to learn more about Fauquier County, Prince William County and Loudoun County Electric Transmission Projects and submit feedback. You can contact the project team by email at powerline@dominionenergy.com or +1 888-291-0190.
Documents
- April 2024 - Project Letter
- April 2025 - Project Announcement Postcard
- June 2025 - Reminder Project Postcard (with alternates map)
- June 2025 M-WS Loudoun County Update
- November 2025 Project Postcard - Prince William County
- April 2025 Project Letter (English)
- April 2025 Project Letter (Spanish)
- Morrisville-Wishing Star Fact Sheet 2025
- March 2026 Notice of SCC Filing Letter (English & Spanish combined)