How can we help you?
Electric Transmission Access
Ensuring reliable and compliant transmission
The operational and planning functions of Dominion Energy's electric transmission system are provided by PJM Interconnection, a regional transmission organization (RTO).
PJM Interconnection ensures the reliability of the largest centrally dispatched electric grid in the world. Read more about PJM's role as a RTO.
Acting neutrally and independently, it also operates the largest competitive wholesale electricity market in the world.
Transmission and Interconnectivity
Open Access Transmission
- Tariff PJM Open Access Transmission Tariff (OATT)
- Information/Notices (May 13, 2025)
Interconnections
- Customer Parallel Generation – Interconnection: You must obtain permission to interconnect your parallel generator to Dominion Energy's electric grid. Learn more about the important steps to follow to ensure proper and safe interconnection.
- Transmission Interconnections: See the facility interconnection requirements.
- Form of Interconnection Facilities Study Agreement
- Form of Construction Agreement
Transmission Resources
Standards of Conduct Information
Dominion Energy Virginia is committed to adherence with the rules and regulations of the Federal Energy Regulatory Commission (FERC) Standards of Conduct (Order No. 717). Dominion Energy Virginia shall maintain on its Internet website the following informational postings required by the FERC Standards of Conduct and §358 of the Commission's Regulations. This information will be updated within seven business days of any change and will post the date the information was updated.
Documents
Additional Voluntary Consent Documents
Control Area Information
- Control Area Load 1989-2004
- Control Area Load 2005 (through 4/30)
- LAMBDA 2003
- LAMBDA 2004
- LAMBDA 2005 (through 4/30)
- Monthly Transmission Peaks 1999-2005 (4/30)
- PJM-South Zone Load History
- PJM-South Zone Load 2008
- PJM-South Zone Load 2009
- PJM-South Zone Load 2010
- PJM-South Zone Load 2011
- PJM-South Zone Load 2012
- PJM-South Zone Load 2013
- PJM-South Zone Load 2014
- PJM-South Zone Load 2015
- PJM-South Zone Load 2016
- PJM-South Zone Load 2017
- PJM-South Zone Load 2018
- PJM-South Zone Load 2019
- PJM-South Zone Load 2020
- PJM-South Zone Load 2021
- PJM-South Zone Load 2022
- PJM-South Zone Load 2023
- PJM-South Zone Load 2024
- PJM-South Zone Load 2025
- PJM-South Zone Load (Current Month)
- Monthly PJM-South Zone Peaks