Powerlines

Purpose

We have identified an aging electric transmission line, which has been in operation for over five decades. This aging line, which is known as the VCS – Denny Terrace and Pineland 230 kV, originate in Fairfield County at the VC Summer Nuclear Plant and end in Richland County at the Denny Terrace and Pineland substations. This rebuild project is 22 miles in length and will be done exclusively on existing right of way along an existing transmission corridor.

We will replace the existing 230 kilovolt (kV) wooden poles along this 22-mile corridor with self-supporting galvanized steel structures. The new line will be designed to meet all modern electric codes as well as provide additional reliability and resiliency to the areas along the route. The rebuilt lines will be constructed by Dominion Energy contractors.

Benefits

  • Maintains current right of way
  • New structures located in the same general location as existing structures
  • Complies with mandatory standards to ensure safety, reliability and to meet future needs
  • Minimizes impact to the community and environment
  • Replaces aging infrastructure

Timeline

The engineering design and environmental permitting began in the summer of 2020 and will continue through 2021. Line construction is expected to start in the 1st quarter of 2022 and will continue into the 3rd quarter of 2023.

Contact Us

Call us M - F, 8am - 5pm

(866) 865-1466

Construction-Related Impacts

Service Interruption

Your electric service is not expected to be impacted by this project.

Equipment Lifespan

50+ Years

The equipment has been in service for 50+ years and needs to be replaced.

Traffic

This project is not expected to impact traffic.

Noise

Noise levels will be minimal; permits are in place.

Construction Times

8am - 5pm

Most work will be completed between these hours, on weekdays.

Environment

This project will not have environmental impacts.

Neighborhood

Access to surrounding neighborhoods will not be impacted.