Virtual Community Meeting - WebEx Event

Did you miss our Mt. Storm-Valley Phase 2 virtual community meeting?

Watch the Video

At Dominion Energy, we are committed to continually reviewing and analyzing our energy infrastructure to provide the most safe and reliable electric service. We are currently exploring options to address an aging 500 kilovolt (kV) electric transmission line running from West Virginia into northwest Virginia. The line needs to be replaced to maintain reliability for our customers.

Updates

September 2020

  • Phase 1 – Crews continue to install foundations and prepare structures for installation.
  • Phase 2 – Access road installation and foundation installation are ongoing.
  • Phase 2A – Access road installation is ongoing. 
  • Phase 3 – Planning and coordination with the United States Forest Service (USFS) and other agencies is ongoing for the section of work in the National Forest. Construction is anticipated to begin on this phase in 2021.

Project Goals

  • Create no new right of way
  • Keep structures in the same general location as existing structures
  • Provide long-term reliability and durability without excessive maintenance
  • Comply with mandatory standards to ensure safety and reliability

Win a $100 Gift Card!

Gift Card Drawing

We need your help to improve the Power Line Project pages of our website! Participate in a 10 minute survey in order to be entered in a drawing for a $100 VISA gift card.

Begin Survey Now

Overview & Project Description

This project will rebuild an existing 500 kilovolt line running southeast from West Virginia’s Grant, Hardy and Pendleton counties into Virginia’s Rockingham and Augusta counties. The line has been in operation for over five decades and needs to be replaced to maintain reliability for our customers. A total of 261 structures will be replaced on the 64-mile line – including 258 brown, weathering steel lattice structures. The new proposed galvanized steel lattice structures will stand 118 feet tall on average, or about 15 feet taller on average than the existing structures.

Timeline

SCC Applications

The Virginia State Corporation Commission (SCC) has regulatory authority over all energy providers in Virginia. Among other responsibilities, the SCC validates the need for a proposed line and approves the route and structures. In reviewing a proposed project, the SCC must consider whether potential impacts on scenic assets, historic districts and the environment have been reasonably minimized.


Application Documents