Centreport 230 kV

Electric Transmission Project

To support growing energy demands in Stafford County, Dominion Energy is proposing a new substation and double circuit 230 kV Electric Transmission Line to connect the new substation to our existing electric transmission grid.
This new infrastructure will allow us to meet the growing energy needs, continue reliable electric service, and maintain compliance with federal reliability standards.

New (April 2024) View Routes in detail with MapChat by ERM - our interactive mapping tool.

 

Benefits

  • Complies with mandatory standards to ensure safety, reliability and to meet future needs.
  • Strengthens area reliability.
  • Strengthens operational flexibility.

Documents

Recent Updates

  • June 4, 2024 - Community Meeting #2. Rowser Building Room A 5-7 p.m
  • Early April 2024 - Initial routes shared. Visit the map section of the website to view the routes.
  • April 23, 2024 - Community Meeting at the Rowser Building. Visit the meetings section of the website for more information.

Maps

View the project area and routes, zoom in, measure, leave comments for our team, and more with MapChat by ERM, our interactive mapping tool.

Vista general del proyecto

Para apoyar la creciente demanda de energía en el condado de Stafford, Dominion Energy propone una nueva subestación y una línea de transmisión eléctrica de 230 kV de doble circuito para conectar la nueva subestación a nuestra red de transmisión eléctrica existente.

Esta nueva infraestructura nos permitirá satisfacer las crecientes necesidades energéticas, continuar con un servicio eléctrico fiable y mantener el cumplimiento de las normas federales de fiabilidad.

Nuevo (abril de 2024): vea las rutas en detalle con MapChat de ERM, nuestra herramienta cartográfica interactiva.

Beneficios

  • Cumple con las normas obligatorias para garantizar la seguridad y la fiabilidad y para satisfacer las necesidades futuras.
  • Refuerza la fiabilidad de la zona.
  • Refuerza la flexibilidad operativa.

Cronograma

  • Principios de 2024 – Anuncio del proyecto
  • Primavera-verano de 2024 – Divulgación al público
  • Principios de otoño de 2024 – Se presenta la solicitud ante la Comisión Estatal de Sociedades (State Corporation Commission, SCC) de Virginia
  • Otoño de 2025 – Fallo previsto de la SCC
  • 2026 – Tramitación de permisos, finalización de la ingeniería, divulgación previa a la construcciónTramitación de permisos, finalización de la ingeniería, divulgación previa a la construcción
  • Verano de 2026 – Comienza la construcción
  • Verano de2027 Finaliza la construcción, comienza la restauración

Documentos

Actualizaciones recientes

  • 4 de junio de 2024 - Reunión comunitaria #2. Rowser Building, sala A, 5-7 p.m.
  • Principios de abril de 2024 - Se dan a conocer las rutas iniciales. Visite la sección de mapas de la página web para ver las rutas.
  • 23 de abril de 2024 - Reunión comunitaria en Rowser Building. Visite la sección de reuniones de la página web para obtener más información .

Contáctenos

Llámenos de lunes a viernes, de 8 a.m. a 5 p.m.

888-291-0190

Envíenos un correo electrónico a

powerline@dominionenergy.com

1. Why is this project needed?

Due to recent growth and future development on the horizon in Stafford County, there is a need for new electric transmission infrastructure investments to maintain grid reliability. This new infrastructure will allow us to meet the growing energy needs, continue reliable electric service, and maintain compliance with federal reliability standards.

2. What are the next steps I should be aware of?

Our project team will focus on public outreach in spring and summer 2024 to ensure all interested community members are aware of the project and have an opportunity to share feedback with our team as we continue the planning process. We intend to file an application with the SCC in fall 2024.

3. Who has oversight and approval over this project?

The SCC is the regulatory body with jurisdiction over transmission lines at or above 138 kilovolts (kV). Since this project is proposing to build a new double circuit 230 kV transmission line, it meets the criteria to be reviewed by the SCC. Dominion Energy intends to file an application in early fall 2024.

Although the SCC is the primary agency reviewing and ultimately approving the project, there may be additional permits needed from local, state, and federal agencies.

4. Does my feedback matter and how can I share it with Dominion Energy?

We want to hear your feedback. The purpose of our public engagement is to share, listen and learn from our community members. The SCC also considers public input in its review process. There are multiple ways to share your feedback with our team:

5. I’m unable to attend the open house meetings. Are there other opportunities for a meeting?

Interested community members are welcome to request a separate meeting with our team. Whether you have a scheduling conflict during the community meeting dates, would like to discuss your property specifically, or would like to continue a discussion with our team following a community meeting, we are available for additional meetings by request.

The Virginia State Corporation Commission (SCC) has a regulatory authority over all energy providers in Virginia. Among other responsibilities, the SCC validates the need for a proposed line and approves the route and structures. In reviewing a proposed project, the SCC must consider whether potential impacts on scenic assets, historic districts and the environment have been reasonably minimized.

Dominion Energy submitted its application regarding this project on September 19, 2024. Documents related to the case are made available to the public on the SCC Docket website or search by Case No. PUR-2024-00170 in the Search Cases section. This project was approved on June 10, 2025

 

Application

Procedural Schedule

  • November 20, 2024 – Landowner Notice, Publication Deadline, and Government Official Notice
  • December 4, 2024 – Proof of Notice and Certificate of Mailing deadline
  • February 12, 2025 – Notice of Participation deadline
  • February 12, 2025 – Respondent Testimony due
  • March 12, 2025 – Staff Report due
  • March 26, 2025 – Company Rebuttal Testimony due
  • April 9, 2025 – Public witness signup deadline
  • April 9, 2025 – Any interested person may submit comments on the Application (on or before)
  • April 16, 2025 – Telephonic Hearing for Public Witness Testimony (10:00 a.m.)
  • April 16, 2025 – In-Person Public Evidentiary Hearing (10:00 a.m.)
You are invited to a community meeting to learn more about the project, ask questions, and speak with subject matter experts about what is most important to you. View simulations of proposed route alternatives.

Previous Meetings
Tuesday, June 4, 2024
Rowser Building, Room A
5:00-7:00 p.m.


April 23, 2024
Rowser Building, Room A
5:30-7:30 p.m.

View informational boards on display at both community meetings

Upcoming

Summer 2027
Construction complete, restoration begins
Summer 2026
Construction to begin
2026
Permitting Finalize engineering Pre-construction outreach
Fall 2025
Anticipated SCC ruling

2024

Early Fall 2024
File application with the Virginia State Corporation Commission (SCC)
Spring-Summer 2024
Public Outreach
Early 2024
Project Announcement

Powerlines 101 - Learning Zone

Learn how the energy grid works; along with our processes to build and maintain electric transmission lines.
Discover about your lines cta btn