success-icon
The redesigned DominionEnergy.com is here!: A fresh look, easier navigation, and enhanced search features make it easier than ever to find the information you need.

Lake Gaston/Roanoke Rapids Lake Shoreline Permitting

Construction and Use Procedures

Rules governing use of Dominion Energy's shoreline.

View PDF cta btn

Construction and Use Agreement

Application for required shoreline use permit.

View PDF cta btn

Permit Fees and Costs

Costs of various shoreline permits.

View PDF cta btn

Online Permit Payments

Pay permit fees online.

Pay Online cta btn

Required Information To Be Included With Construction and Use Agreement

  • Proof of ownership; copy of deed and drawing/photo of existing structure.
  • Drawing of proposed structure with dimensions.
  • Drawing/map indicating where structure will be placed regarding property boundaries.
  • Drawing of current structure with dimensions and modified structure with dimensions.
  • Linear feet of rip rap to be installed.
  • Drawing of placement on shoreline.
  • Drawing showing area to be dredged, with dimensions.
  • Map/drawing of where dredged material will be disposed.
  • Drawing/aerial photo showing area to be trimmed, proposed trees to be removed, landscaping to be installed with species list.

Special Management Area Maps

See a map of shorelines showing special management areas.

See Our Map cta btn