success-icon
The redesigned DominionEnergy.com is here!: A fresh look, easier navigation, and enhanced search features make it easier than ever to find the information you need.

Tarboro to Hathaway

230 kV and Partial 115 kV Electric Transmission Rebuild Project

Overview

Lineworker in front of Dominion Energy truck
This approximately 17-mile overhead electric transmission line corridor was constructed in 1967 on primarily wooden H-frame and steel lattice structures. The line needed to be rebuilt to meet current safety and reliability standards based on end-of-life concerns. The new structures are located near the previous structures using the current transmission line easement. No new right of way was needed to complete this project.

Benefits

  • Maintains current right of way
  • New structures located in the same general location as existing structures
  • Complies with mandatory standards to ensure safety, reliability and to meet future needs
  • Minimizes impact to the community and environment
  • Replaces aging infrastructure

Timeline

  • Summer 2022 - Summer 2023 - Anticipated Phase 1: Tarboro area line work
  • Fall 2022 - Spring 2024 - Anticipated Phase 2: Tarboro to Hathaway line work

Documents

Timeline

2022

Fall 2022 - Spring 2024
Anticipated Phase 2: Tarboro to Hathaway line work  (Work includes preconstruction activities through right of way restoration)
Summer 2022 – Summer 2023 
Anticipated Phase 1: Tarboro area line work

FAQs

Call us at 888-291-0190 or send an email to powerline@dominionenergy.com and ask to be added to our mailing distribution list.

Dominion Energy Virginia has more than 6,700 miles of transmission lines. This project replaces existing overhead structures with new, similar overhead structures within the existing right of way. In doing so, the line will be rebuilt to current safety and industry standards.

The existing line is built primarily on wooden H-frame structures. The average height of the existing structures is approximately 60 feet; the average height of the new structures is approximately 85 feet.

Our forestry team will survey trees in the area to identify danger trees that need removal. Danger trees are trees outside the right of way, and possibly on your property, that have the potential to fall within 10 feet of the transmission wires or structures. Trees and tree limbs that come in contact with electric lines are a leading cause of power outages, especially during storms. The removal of danger trees is necessary to help prevent large scale outages in your community.

If we need to access your property, our forestry team or authorized contractors will contact you. We are committed to working safely and courteously on your property. If you have questions or concerns about the right of way corridor, please email etrow@dominionenergy.com or call 800-215-8032.

Dominion Energy completes an evaluation of potential environmental, cultural and historical impacts of the project. We will work with local, state and federal agencies to complete these evaluations and mitigate any impacts. Permits are obtained from appropriate North Carolina agencies, and transmission line projects usually include the U.S. Army Corps of Engineers. Our enterprise-wide environmental report describes our commitment to the responsible stewardship of natural resources and provides a wealth of information on environmental management and performance. We also invite you to read our Corporate Environmental Policy and our Greenhouse Gas Report.

Service Interruption

Your electric service is not expected to be impacted by this project.

Neighborhood

Access to surrounding neighborhoods will not be impacted.

Traffic

This project is not expected to impact traffic.

Aging Infrastructure

1967. The equipment has been in service for 55 years and needs to be replaced

Noise

Noise levels will be moderate; permits are in place.
Calendar symbol

Construction Times

Most work will be completed during daylight hours, up to seven days a week.

Environment

This project will not have environmental impacts.

Hunting

Hunting activities in the work zone may be impacted. During firearms deer season, crews work in and near the right of way where hunters may be active. Our crews will be wearing high-visibility work vests, so they are easy to see.

Powerlines 101 - Learning Zone

Learn how the energy grid works; along with our processes to build and maintain electric transmission lines.
Discover about your lines cta btn