Liberty-Cannon Branch

230 kV Upgrade

Overview

Lineworker in front of Dominion Energy truck

The Liberty-Cannon Branch 230 kV Upgrade Project is necessary to maintain safe and reliable electric service for our customers and comply with mandatory standards for the electric transmission system. This project involves uprating existing 115 kilovolt (kV) lines between Liberty and Cannon Branch substations to 230 kV and removing existing 115 kV lines between the City of Manassas’ Dominion and Lomar Delivery Point substations.

For the line upgrades, most of the existing transmission structures and wires, or conductor, can accommodate the voltage increase and will not be changed or replaced. Construction needs for this portion of the project are limited to upgrading and reconfiguring equipment in and around the substations along the project route. For the line removals, we will remove the conductors and 14 structures within approximately 1,800 feet of right of way and restore the impacted areas to their preexisting conditions.

Benefits

  • Maintains current right of way
  • New structures located in the same general location as existing structures
  • Complies with mandatory standards to ensure safety, reliability and to meet future needs
  • Minimizes impact to the community and environment

The project was originally announced in late 2020, postponed in late 2021 to evaluate regulatory requirements, then restarted in 2022.

Timeline

Upcoming

Spring 2026
Restoration complete
December 2025
Construction complete

2025

March 2025
Preconstruction begins

2022

Fall 2022
Project Announcement; environmental surveying in right of way corridor. 

Construction-Related Impacts

Service Interruption

Your electric service is not expected to be impacted by this project.

Neighborhood

Access to surrounding neighborhoods will not be impacted.

Traffic

There may be some traffic delays.

Noise

Noise levels will be moderate; permits are in place.

Environment

This project will not have environmental impacts.