At Dominion Energy, we are committed to providing safe and reliable energy to the communities we serve. Our proactive year-round inspection and maintenance program has identified an electric transmission line that requires replacement and rebuilding.
Dominion Energy South Carolina contractors will replace existing wooden poles along a 15-mile corridor in Jasper and Beaufort counties, SC. This rebuild of the the Hardeeville-Bluffton 115 kV line will use self-supporting galvanized steel structures and meet all modern electric codes. The line will be rebuilt exclusively on existing rights of way and provide additional reliability and resiliency to the areas along the route.
Benefits
- Maintains current right of way
- New structures located in the same general location as existing structures
- Complies with mandatory standards to ensure safety, reliability and to meet future needs
- Minimizes impact to the community and environment
- Replaces aging infrastructure
Timeline
2025
Summer 2025
Construction complete
2024
September 2024
Construction begins
2022
Q1 2022
Engineering design and environmental permitting begin
Construction-Related Impact

Service Interruption
Your electric service is not expected to be impacted by this project.

Equipment Lifespan
The equipment has been in service for 50 years and needs to be replaced.

Traffic
This project is not expected to impact traffic.

Noise
Noise levels will be minimal; permits are in place.

Construction Times
Most work will be completed on weekdays between 8 a.m.–5 p.m.

Environment
This project will not have environmental impacts.

Neighborhood
Access to surrounding neighborhoods will not be impacted.