Foster Drive

Substation

Overview

Dominion Energy employee in a hard hat stands, hands on hips, beside a truck

At Dominion Energy, we are committed to continually reviewing and analyzing our energy infrastructure to provide safe, reliable, and affordable electricity to the communities we serve. We are proposing the Foster Drive Substation Project to meet the ongoing economic growth in the City of Manassas, Virginia.

This project proposes to build a new substation and approximately 0.15 miles of new transmission line to connect the new substation to the existing electric transmission grid. The new structures along this short transmission connection will consist of galvanized steel monopole structures.

The new substation will be located off Foster Drive, next to Dominion Energy’s existing Cannon Branch Substation as well as a new substation being constructed by the City of Manassas.

Benefits

  • New structures located in the same general location as existing structures
  • Complies with mandatory standards to ensure safety, reliability and to meet future needs
  • Minimizes impact to the community and environment

Timeline

2026

Spring 2026
Restoration of work area complete

2025

December 2025
Construction complete
March 2025
Construction begins

Construction-Related Impact

Service Interruption

Your electric service is not expected to be impacted by this project.

Traffic

This project is not expected to impact traffic.

Noise

Noise levels will be moderate; permits are in place.

Environment

This project will not have environmental impacts.

Neighborhood

Access to surrounding neighborhoods will not be impacted.