This project will upgrade 230 kilovolt (kV) electric transmission infrastructure between Winters Branch, Wakeman and Cloverhill substations in Prince William County, Virginia. These upgrades involve reconfiguring the existing transmission lines, adding several new structures, and new line segments. This project will enhance reliability and comply with mandatory federal standards.

Benefits

  • New structures located in the same general location as existing structures
  • Complies with mandatory standards to ensure safety, reliability and to meet future needs
  • Minimizes impact to the community and environment
  • Strengthens area reliability
  • Strengthens operational flexibility

Timeline

2025

Summer 2025
Construction complete

2023

Fall 2023
Construction begins (outside Wakeman Substation)
Summer 2023
Project announcement
Project announcement letter

Construction-Related Impact

Service Interruption

Your electric service is not expected to be impacted by this project.

Traffic

This project is not expected to impact traffic.

Noise

Noise levels will be minimal; permits are in place.

Environment

This project may have limited environmental impacts.

Neighborhood

Access to surrounding neighborhoods will not be impacted.