Bermuda Hundred – Darbytown 230kV Rebuild

The Bermuda Hundred–Chickahominy Project will rebuild 34 miles of transmission lines in Charles City, Chesterfield, and Henrico counties. The current lines are old and need to be replaced in the same right-of-way.

Please Select a Datasource for title subhead Component

These transmission line upgrades will also:

  • Meet central Virginia’s growing electric demand.
  • Comply with the North American Electric Reliability Corporation (NERC) standards.
  • Support continued reliability and improve grid efficiency. 

The Bermuda Hundred – Chickahominy

  • Project proposes to rebuild 34 miles of transmission line across Charles City, Chesterfield and Henrico Counties.

    These transmission line upgrades will:
    • Meet central Virginia’s growing energy demand.
    • Support continued reliability and improve grid efficiency.
    • Comply with the North American Electric Reliability Corporation (NERC) standards.

Bermuda Hundred – Chickahominy 

• Rebuild transmission lines between the proposed Bermuda Hundred substation and existing Chickahominy substation – 13. 5 miles.

Chickahominy - Elko 

• Rebuild the existing transmission lines Chickahominy and Elko substations – 7 miles.

Elko -Turner- Darbytown 

• Rebuild the existing transmission lines between the Elko and Darbytown substations – 13. 6 miles
• Upgrade existing infrastructure at both Darbytown and Turner substations
 

Benefits


o Maintains primary existing right of way.
o New structures primarily located in the same general location as existing structures.
o Comply with mandatory standards to ensure safety, reliability and to meet future needs.
o Minimizes impact to the community and environment.
o Strengthens area reliability.
o Strengthens operational flexibility.

Community Engagement

Content to come

Project Timeline

2026

June 2026
Project Announcement
Summer 2026
Community Meeting
Fall 2026
File application with the Virginia State Corporation Commission

2027

Summer 2027
Anticipated SCC ruling

2028

Fall 2028
Construction to begin

2031

Winter 2031
Construction completed